Temporary Lane Closures in Multiple Locations, November 27 through December 1, 2023
(WASHINGTON, DC) —The District Department of Transportation (DDOT) will temporarily close single lanes on the following roadways for bridge and tunnel inspections:
East Capitol Street under Southbound Anacostia Freeway, alternating right and left lane closures of Eastbound East Capitol Street under Southbound Anacostia Freeway followed by alternating right and left lane closures of Westbound East Capitol Street under Southbound Anacostia Freeway on Monday, November 27, during the hours of 10:00 AM and 3:00 PM, weather permitting.
Virginia Avenue N.W. under 23rd Street N.W., alternating right and left lane mobile closures of Northbound Virginia Avenue N.W. under 23rd Street N.W. followed by alternating right and left lane mobile closures of Southbound Virginia Avenue N.W. under 23rd Street N.W. on Tuesday, November 28, during the hours of 10:00 AM to 3:00 PM, weather permitting.
Southbound Anacostia Freeway over East Capitol Street and Ramp C, alternating left and right shoulder closures of Southbound Anacostia Freeway over East Capitol Street and Ramp C on Wednesday, November 29, during the hours of 10:00 AM and 3:00 PM, weather permitting.
Anacostia Freeway over Malcolm X Avenue, alternating right and left shoulder closures of Southbound Anacostia Freeway over Malcolm X Avenue followed by alternating right and left shoulder closures of Northbound Anacostia Freeway over Malcolm X Avenue on Wednesday, November 29, during the hours of 10:00 AM and 3:00 PM, weather permitting.
East Capitol Street under Pedestrian Bridge near Minnesota Avenue, a right lane closure of Eastbound East Capitol Street under the Pedestrian Bridge near Minnesota Avenue followed by a right lane closure of Westbound East Capitol Street under Pedestrian Bridge near Minnesota Avenue on Wednesday, November 29, during the hours of 10:00 AM and 3:00 PM, weather permitting.
K Street Expressway under 22nd Street, 24th Street, and Washington Circle, alternating right lane and left lane closures of Eastbound K Street Expressway under 22 Street, 24thStreet, and Washington Circle followed by alternating right lane and left lane closures of Westbound K Street Expressway under 22 Street, 24 Street, and Washington Circle on Wednesday, November 29, and Thursday, November 30, 2023, during the hours of 10:00 AM and 3:00 PM, weather permitting.
Exit Ramp from I-395 SB to Virginia Ave, S.W. under Entrance Ramp from D Street, S.W. to I-395 SB, a narrowing/partial lane closure of the Exit Ramp from I-395 SB to Virginia Ave, S.W. under Entrance Ramp from D Street, S.W. to I-395 SB on Thursday, November 30, 2023, during the hours of 10:00 AM and 3:00 PM, weather permitting.
Entrance Ramp from D Street, S.W. to I-395 SB over Exit Ramp from I-395 SB to Virginia Ave, S.W., a narrowing/partial lane closure of the Entrance Ramp from D Street, S.W. to I-395 SB over the Exit Ramp from I-395 SB to Virginia Ave, S.W. on Thursday, November 30, 2023, during the hours of 10:00 AM and 3:00 PM, weather permitting.
Northbound Kenilworth Avenue, N.E. under Parkside Pedestrian Bridge, a right lane and shoulder closure of Northbound Kenilworth Ave, N.E. under the Parkside Pedestrian Bridge near Burnham Place, N.E. on Friday, December 1, during the hours of 10:00 AM and 3:00 PM, weather permitting.
E Street Expressway under Virginia Avenue, alternating right lane and left lane closures of Eastbound E Street Expressway under Virginia Avenue followed by alternating right lane and left lane closures of Westbound E Street Expressway under Virginia Avenue on Friday, December 1, 2023, during the hours of 10:00 AM and 3:00 PM, weather permitting.
I-295 Access Road (Dorothea Dix Avenue, S.E.) over the Entrance Ramp from Eastbound Malcom X Avenue to Northbound Anacostia Freeway, alternating right and left lanes closures with a flagging operation of the I-295 Access Road (Dorothea Dix Avenue, S.E.) over the Entrance Ramp from Eastbound Malcom X Avenue to Northbound Anacostia Freeway on Friday, December 1, 2023, during the hours of 10:00 AM and 3:00 PM, weather permitting.
Entrance Ramp from Eastbound Malcom X Avenue to Northbound Anacostia Freeway under the I-295 Access Road (Dorothea Dix Avenue, S.E.), a narrowing/partial lane closure of the Entrance Ramp from Eastbound Malcom X Avenue to Northbound Anacostia Freeway under the I-295 Access Road (Dorothea Dix Avenue, S.E.) on Friday, December 1, 2023, during the hours of 10:00 AM and 3:00 PM, weather permitting.
Northbound South Capitol Street, S.E. under the Ramp from Southbound Anacostia Freeway to Southbound South Capitol Street, S.W. (Exit 2B), alternating right and left lane closures of Northbound South Capitol Street, S.E. under the Ramp from Southbound Anacostia Freeway to Southbound South Capitol Street, S.W. (Exit 2B) on Friday, December 1, during the hours of 10:00 AM and 3:00 PM, weather permitting.
Exit Ramp from Southbound Anacostia Freeway to Southbound South Capitol Street, S.W. (Exit 2B), a narrowing/partial lane closure of the Exit Ramp from Southbound Anacostia Freeway to Southbound South Capitol Street, S.W. (Exit 2B) on Friday, December 1, during the hours of 10:00 AM and 3:00 PM, weather permitting.
Traffic controls will be in place to warn drivers approaching the areas. Motorists should anticipate moderate-to-heavy delays due to the lane closures, advised to stay alert while traveling through these locations, and be observant of the inspection personnel.